M o v i n g   t o w a r d s   a   c l e a n   a n d   
h e a l t h y   t o m o r r o w...

  • Solve sewer and pipeline problems without digging or disrupting
  • Offers many specialist methods for even the most hostile environments
  • Safety and liability risks are minimal
  • Large cost benefits
  • Proven worldwide

The Lining Process:

The lining system comprises of the inversion into the defective pipe of a polyester felt tube which has a Polyurethane outer coating. The liner is impregnated with a liquid resin which is chosen to suit the situation in which the liner is to operate, and which is designed according to individual specification for thickness.

For the defective pipeline in a manhole either the inversion tower, or a Pressure water system is used to apply the head of water pressure needed to invert the liner tube into the pipe. At points of access along the sewer thermocouples are positioned to monitor curing temperature along the liner.

When the liner is fully inverted, high pressure water is used to propel the liner forward. After completion of inversion we deploy the boiler from whence hot water is circulated to the temperature required to cure the liner.

CIPP (Cured-in-place-pipe):

      

  • Most widely used trenchless method for restoring structural integrity and removing infiltration from sewers.
  • This method results in a seamless, joint less "pipe-within-a-pipe" with a smooth, continuous inner surface which increases flow capacity.

The benefits of using CIPP lining system…

  • It can be quickly installed without excavation causing minimal disruption
  • Forms a structural and durable new pipe within the old pipe
  • Bridges and seals gaps, holes, cracks etc.
  • Eliminates infiltration from joints
  • Resistant to chemical attack and corrosion
  • Forms to any shape of pipe and bends
  • Improves the carrying capacity and flow characteristics
  • Cost-effective and convenient
  • Can handle pipe sizes from 75mm to over 2500mm

Envirotech's other Trenchless Technology

PIPE BURSTING
SLIP LINING
MICROTUNNELING
HORIZONTAL DIRECTIONAL DRILLING
AUGER BORING
PIPE JACKING
SHOTCRETE
TUNNELING

PRIOR TO LINING - PREPARATION CONSISTS OF THE DESILTING BY PRESSURE JETTING CUM SUCTION FOLLOWED BY CCTV SURVEY

JET VAC:

            

Flex Line® 310, 01-1-041
Tank 10.000 litres with piston, fully automatic end cover and 3 sets of pneumatically locking bolts.
Vacuum Wittig RFW 200, capacity 1200 m³/hour. External cyclone filter - pipe Ø 101.6 Cassette system for suction hose 4" with lift and double telescopic arm.
High-pressure URACA KD 716 G, capacity: 391 l/min. 140 bar.3/4" hydraulically operated hose drum, hydraulic swivel 50m 3/4" + 60 m 1/2" hose.5/4" hydraulically operated hose drum, manual swivel, 150m 5/4" hose. Oil burner - Webasto 9 kW.
Transmissions Semi-hydraulic.
Extra Remote control with 8 functions. Comfort cabinet.
Chassis Scania P114GB 6x4 NZ K 43.

THE JET-VAC MACHINE or THE FLEXLINE VAN:

Used for cleaning or jetting the sewer. Using high pressure jet of water to clean the sewers, followed by sucking out the sludge by vacuum extraction before installation of the lining.

The CCTV Survey:

Prior to the installation the sewer line is inspected using a CCTV camera. This is to ensure that the pipeline is free of silt, debris, tree-roots or intrusions, which could adversely affect the lining installation.

With a range of cameras able to survey and record information from pipe sizes 75mm to 2000mm the EOL CCTV survey division has already completed over 100s of kilometers. The CCTV van is made to our specifications to suit our projects.

        

 
Top